Bids can be submitted for natural gas (H-gas) as well as for biogas. The delivery period runs from 1 July 2023, 06:00 hours to 1 January 2024, 06:00 hours. Fluxys TENP GmbH is tendering an estimated total quantity of fuel gas of 230,000 MWh. Interested bidders can submit their bids by 16 May 2023 at 14:00 hours at the latest.
Fluxys TENP GmbH would hereby like to provide all interested parties with the following information related to the capacity offered in the yearly auction on PRISMA to be held on 3 July 2023
Fluxys Belgium is launching a call for tenders with a view to appointing statutory auditors for the annual and consolidated accounts of the Fluxys Belgium Group (Fluxys Belgium SA, Fluxys LNG SA and Flux Re SA) for the years 2019, 2020 and 2021. The scope of the assignment may be extended to the auditing of the annual accounts of Fluxys SA and its subsidiaries.
Fluxys TENP informs about the offer level (existing capacities and new capacities to be created) and the annual auction on July 5th 2023 on the auction platform PRISMA of capacities resulting from the “Incremental Capacity” project at the market area border THE-ZTP.
In the first six months of the year, Fluxys Belgium transmitted 238.1 TWh of natural gas through the Belgian network, of which 141.8 TWh was exported to neighbouring countries, more than half of it to France. Strikingly, large quantities of natural gas were transmitted to the United Kingdom during the cold spell in the first few months of the year.
Fluxys TENP joins the Industrial Pact NRW. The alliance's mission is to show North Rhine-Westphalian industry ways to become climate neutral.
Terminal users are now able to book Residual Storage Capacity: LNG storage capacity on a daily basis. The new service makes it possible to unload larger LNG volumes and store them over a longer period of time. This allows for more flexibility to regasify LNG and send it to the grid or to reload LNG onto small LNG vessels, LNG trucks or LNG containers at a later time.
Fluxys has made €1 million available to support a variety of initiatives aimed at alleviating societal needs in these difficult times. Many of our employees have also been personally involved in providing assistance during the lockdown.
Fluxys TENP informs about a new fee for non-binding demand indications which will be charged by the German transmission system operators from the incremental capacity cycle 2023 - 2025 onwards.
LNG truck loading at the Zeebrugge LNG terminal has boosted over the past few years and Fluxys has innovated its service offer to enhance availability and flexibility. The current subscription window offers customers the opportunity to secure the number of loading slots they wish to use from 2019 until 2028 included.
On 1 October 2022, the market area manager Trading Hub Europe (THE) will invoice the balancing group managers for the first time for the storage levy.
Bids can be submitted for natural gas (H-gas) as well as for biogas.
The delivery period runs from 1 January 2023, 06:00 hours to 1 July 2023, 06:00 hours.
Fluxys TENP GmbH is tendering an estimated total quantity of fuel gas of 210,000 MWh.
Interested bidders can submit their bids by 18 October 2022 at 14:00 hours at the latest.
Fluxys TENP extends its offered capacity products.
For the Trading Hub Europe (THE) market area the transmission system operators have recalculated the uniform tariff from 1 January 2023 on the basis of the decision “Approval of the recalculation of the reference price for the year 2023 (REGENT-recalculation 2023)”, BK9-22/615 of the Federal Network Agency (BNetzA).
Fluxys TENP GmbH maintains its proven strategy and again covers part of its fuel gas requirements for the first half of the year 2023 with biogas
Fluxys Deutschland GmbH, Gasunie Deutschland Transport Services GmbH and ONTRAS Gastransport GmbH have signed a fractional ownership agreement with GASCADE Gastransport GmbH for the pipeline project European Gas Pipeline Link (EUGAL).
Fluxys TENP GmbH and Open Grid Europe GmbH inform about the taking over of odorised gas at the IP Wallbach / VIP Germany-CH.
Looking for Storage opportunities ? Have a look at the capacities currently for sale at Loenhout Storage facility.
Fluxys TENP GmbH would like to draw your attention to the publication of the consultation document within the Incremental Capacity cycle 2021-2023.
As from 17 May until 31 May 2021 participate in our new Subscription Window for yearly Quality Conversion Services.