FluxSwiss is pleased to launch a tender for a group of six monthly products from October 2021 to March 2022.
Interconnector is currently consulting on amendments to its Access Rules and Charging Methodology.
This consultation closes at 17:00 UKT on 15 March 2026.
A group of eleven European gas infrastructure companies including Fluxys Belgium presents a plan for a dedicated hydrogen transport infrastructure. New research shows that existing gas infrastructure can be modified to transport hydrogen at an affordable cost.
Today, the Gas for Climate consortium publishes its hydrogen legislation paper. This paper groups together the vision of 11 Gas Transmission System Operators (TSOs) on how EU legislation can help to create a dedicated hydrogen pipeline infrastructure across Europe.
Antwerp@C, an initiative of Air Liquide, BASF, Borealis, ExxonMobil, INEOS, TotalEnergies, Fluxys and the Port of Antwerp has the ambition to support industries’ efforts towards a 50% CO2 emissions’ reduction within the Port of Antwerp, Belgium, by 2030 through the creation of a common CO2 infrastructure. With the start of engineering studies, the project has now reached a new milestone to achieve more sustainable, lower-carbon operations around the Port of Antwerp.
With this support, Antwerp@C reaches a new milestone and is strengthened in its ambition to reduce the CO2 emissions within the port potentially by half between now and 2030.
Neighborhood becomes strategic partnership: Dow, one of the world's leading material sciences companies, is taking a minority stake in the Hanseatic Energy Hub GmbH. The existing consortium comprising Fluxys, Partners Group and Buss Group is planning to build an import terminal for liquefied natural gas (LNG) at the Stade Industrial Park.
On Wednesday 4 October 2023, Fluxys took part in an event called "Decarbonisation, flexibility and energy transition in the Hainaut industry". The event was the result of a partnership between the grid operators (Elia, Fluxys and ORES), CENEO, the intermunicipal energy financing body for the province of Hainaut, and the regional development agencies (IDEA, IDETA and IGRETEC).
Today, Fluxys and OQGN signed a Memorandum of Understanding (MoU) to jointly explore a strategic cooperation in the development of hydrogen and CO2 infrastructure projects in Oman. Today was also the day of the first listing of the OQGN shares at the Muscat Stock Exchange in Oman. Fluxys has acquired a 4.9% stake in OQGN as an anchor investor as part of the stock market introduction of OQGN.
Eni is holding transportation capacity auctions for the period 01/07/2020 - 01/10/2020.
Fluxys TENP GmbH is tendering an estimated total quantity of 210,000 MWh natural gas (H-gas) and 22,085 MWh biomethane.
The delivery period runs from 1 July 2026, 06:00 hours to 1 January 2027, 06:00 hours.
Interested bidders can submit their bids by 11 June 2026 at 14:00 hours at the latest.
The prequalification phase for both tenders ends on 3 June 2026 at 14:00 hours.
FluxSwiss is offering transportation capacities North-South in the route Wallbach – Gries Pass on a Firm basis for the Month of May 2026.
FluxSwiss is offering transportation capacities North-South in the route Wallbach – Gries Pass and South-North in the route Gries Pass - Wallbach on a Firm basis for the Month of March 2026.
Fluxys LNG is offering slots to unload, store, and regasify LNG cargoes in the Zeebrugge LNG Terminal for July to December 2026.
Following latest April auction, during which the remaining storage capacity for the Storage Year 2026–2027 was offered but not fully allocated, and in light of the continued need to fill European storage facilities ahead of winter, particularly given recent geopolitical developments, Fluxys Belgium is organising a second auction on the 28th of May for its remaining Golden SBUs for Storage Year 2026-2027. In this auction, Fluxys is offering 53 458 Golden SBUs for the remainder of storage year 2026-2027, with the service period 1 June 2026-31 March 2027.
Fluxys LNG has 2 remaining unloading slots on sale on 9 and 17 July 2026 after the auctions of 5 May 2026.
The slot will be allocated on a first committed first served basis.
Interconnector is pleased to confirm extensions to its IAM offering and reduction in its UK to BE Commodity Charge
FluxSwiss is offering transportation capacities North-South and South-North in the routes Wallbach – Gries Pass and Gries Pass – Wallbach on a Firm basis for the Month of June 2026.
The Belgian State Visit to Norway in March 2026 came at a significant moment for Europe’s energy system and supply. The visit highlights the growing strategic importance of cooperation between Belgium and Norway, particularly in the fields of security of supply, decarbonisation and energy infrastructure. For Fluxys, the visit underlines Norway’s central role as a long-standing and future-oriented partner across natural gas, offshore energy and CO₂ infrastructure.
Fluxys attended the North Sea Summit 2026 in Hamburg, where HyNOS (a coalition of hydrogen transmission system operators, of which Fluxys is part) joined governments, the wind industry, and electricity-TSOs in signing the Joint Offshore Wind Investment Pact; a key step toward a resilient, integrated and decarbonised European energy system.