Twelve European gas TSOs from eleven European countries have joined the EHB initiative
EHB group presents a vision for a 39,700km hydrogen pipeline infrastructure in 21 countries
Two-thirds of the network is based on repurposed natural gas pipelines
Lower investment cost per kilometre of pipeline compared to previous estimate
The Zeebrugge LNG terminal again widens its destination flexibility. This week we saw the first customer load an LNG container at the facility for rail transport. This lowers emissions and widens destination flexibility.
Friday 8 July, the terminal for liquified natural gas (LNG) in Dunkirk has received its first LNG tanker, thereby launching the industrial start-up of the facility.
Fluxys as partner in the Trans Adriatic Pipeline (TAP) is pleased to announce that the pipeline started commercial operations: an additional energy route into Europe has now opened after 4 and a half years of construction.
CO₂ capture and utilisation/storage (CCUS) is essential for industry to achieve its transition objectives, especially for hard-to-decarbonise sectors such as steel, petrochemical, cement, and lime production. Fluxys Belgium, Pipelink and Air Liquide are joining forces in 'Fluxys c-grid Antwerp,' a joint venture that will build and operate a CO₂ pipeline network in the Antwerp port area to connect industrial players to permanent underground storage solutions.
The planned maintenance shutdown for Calendar Year 2026 will commence 06:00 CET Tuesday 01 September 2026 for a duration of 20 days ending at 06:00 CET Monday 21 September
2026.
Fluxys TENP GmbH informs about the capacity offer in the yearly auction of PRISMA on 7 July 2025 and about the tariffs for the calendar year 2026.
In the context of the upcoming Yearly Auctions on Exit Virtualys (BE FR) Interconnection Point, Fluxys Belgium is enquiring whether the currently offered capacity towards France is still required, and asks interested market participants to demonstrate this by booking capacity over multiple years.
Ship owners and haulage companies as well as remote industry increasingly choose Liquefied Natural Gas (LNG) as alternative low emission fuel. Their supply can now be sourced from the Dunkirk LNG terminal.
INT has published the latest version of its Charging Statement which includes the Annual Tariff Publication for Gas Year 2025.
INT is today launching an Open Season for its BE to UK capacity
The specific biogas levy will be charged in addition to the tariffs of exit points to directly connected end users and to downstream network operators. Exit points to storages, cross-border interconnection points and market area interconnection points are not taken into account in accordance with Section 7 KoV IX (main part). For the calendar year 2018 the nationwide standard specific biogas levy amounts to 0.00187515 €/kWh/h/d. This corresponds to an annual value of approx. 0.68443 €/kWh/h/a. BEATE multipliers are not applied on the specific biogas levy.
On 11 July 2025, the TENP III pipeline was officially inaugurated with a celebratory event at the compressor station Hügelheim, after the successful completion of about three years of construction work on a length of 110 kilometers.
We decided to extend current Scheduling Congestion Period as from Monday 20th of November.
FluxSwiss has published the second revision of the maintenance activities planned for the calendar year 2024 related to its forward and reverse flow capacities.
Fluxys LNG is offering a Slot to unload, store and regasify a LNG cargo in the Zeebrugge LNG Terminal, starting on 12 July 2023.
For this cargo, Fluxys LNG has upgraded the standard Slot size and commercializes as a bundle the firm rights to unload, store and regasify up to 165 000 m³ LNG over 10 days.
Fluxys LNG will offer 2 Stand Alone Berthing Rights (“SABRs”) in an auction.
The SABRs are offered for the period starting on the 1st of December 2023 and ending on the 31st of December 2023.
Following a significant growth in the truck loading activities at the Zeebrugge terminal, Fluxys LNG has already taken several actions to maximize the truck loading offer and its utilisation. Fluxys LNG has for example implemented scheduling congestion rules in the regulatory documents and is investing in four new self-loading bays.
Fluxys LNG has 1 remaining Stand Alone Berthing Right (“SABR”) on sale for October 2023.
The SABR is offered for the period starting on the 1st of October 2023 and ending on the 31st of October 2023 and allocated on a first committed first served basis.
Fluxys LNG is offering Slots to unload, store and regasify a LNG cargo in the Zeebrugge LNG Terminal, starting on 25 and 30 March 2024.