Fluxys Belgium market consultation 74: Update of annex 7 of the Standard Connection Agreement – Local Producer - Non-Compatible Gas

Participate in our market consultation that will take place from 31 July 2026 to 28 August 2026. The following changes are introduced in the regulatory document:

  • Annex 1 (Operational Procedures) of the Standard Connection Agreement - Local Producers - Non-Compatible Gas

1. Contractual and legal wording:

  • Clarify terminology and definitions
  • Ensure consistency with the Connection Agreement

2. Metrology requirements:

  • Metering system according to EN 1776
  • Add the possibility for mass measurements as custody transfer (versus volume measurement with volume conversion device)

3. Safety and gas quality:

  • Updated safeguarding philosophy + relaxation of the target mitigated event likelihood table
  • Being more specific regarding physical access rights to the metering facilities for Fluxys

 

Documents in consultation (with track changes):

 

You are kindly invited to send your written comments to marketing@fluxys.com by Friday 28 August 2026 before 17:00 CEST.

Please specify in your response whether the content is to be treated as confidential or not. Unless otherwise mentioned, all comments will be treated as non-confidential.

Current status of the consultation

Step 1 active step 3 to be started step 4 to be started step 5 to be started
Invitation to participate Review after comments Approval CREG

Updated documents 

 

Consultation Report

The consultation report will be provided after the end of the consultation.

 

CREG Decision

The decision will be provided after the end of the consultation.