Hydrogen pipeline in North Sea Port

To better respond to the current market situation, the project timeline has been adjusted. The execution of studies and fieldwork is postponed to a later, more suitable time.

Key figures

  • The pipeline will be built in the following municipalities: Gent, Evergem, Zelzate, Lochristi
  • Length: 33.7 km
  • Diameter: 600 mm