Your enthusiasm and interest for our Truck Loading activity in Zeebrugge has brought our truck loading bays to almost full capacity utilisation in 2022 and are fully booked for 2023 and 2024.
In order to maximize the effective usage of the booked truck loading slots for 2023 we decided to extend current Scheduling Congestion Period ending 31st December 2022 from 1st January to 31st December 2023 included.
A Scheduling Congestion Period is announced from 17th January to 17th March 2022 included.
The Scheduling Congestion Period is extended from 1st June to 31st December 2022 included.
Fluxys TENP GmbH informs about the capacity offer in the yearly auction of PRISMA on 7 July 2025 and about the tariffs for the calendar year 2026.
In the context of the upcoming Yearly Auctions on Exit Virtualys (BE FR) Interconnection Point, Fluxys Belgium is enquiring whether the currently offered capacity towards France is still required, and asks interested market participants to demonstrate this by booking capacity over multiple years.
Ship owners and haulage companies as well as remote industry increasingly choose Liquefied Natural Gas (LNG) as alternative low emission fuel. Their supply can now be sourced from the Dunkirk LNG terminal.
INT is today launching an Open Season for its BE to UK capacity
INT has published the latest version of its Charging Statement which includes the Annual Tariff Publication for Gas Year 2025.
The planned maintenance shutdown for Calendar Year 2026 will commence 06:00 CET Tuesday 01 September 2026 for a duration of 20 days ending at 06:00 CET Monday 21 September
2026.
CO₂ capture and utilisation/storage (CCUS) is essential for industry to achieve its transition objectives, especially for hard-to-decarbonise sectors such as steel, petrochemical, cement, and lime production. Fluxys Belgium, Pipelink and Air Liquide are joining forces in 'Fluxys c-grid Antwerp,' a joint venture that will build and operate a CO₂ pipeline network in the Antwerp port area to connect industrial players to permanent underground storage solutions.
The specific biogas levy will be charged in addition to the tariffs of exit points to directly connected end users and to downstream network operators. Exit points to storages, cross-border interconnection points and market area interconnection points are not taken into account in accordance with Section 7 KoV IX (main part). For the calendar year 2018 the nationwide standard specific biogas levy amounts to 0.00187515 €/kWh/h/d. This corresponds to an annual value of approx. 0.68443 €/kWh/h/a. BEATE multipliers are not applied on the specific biogas levy.
On 11 July 2025, the TENP III pipeline was officially inaugurated with a celebratory event at the compressor station Hügelheim, after the successful completion of about three years of construction work on a length of 110 kilometers.
The regulation of gas transit should seek to ensure advantages for consumers and enhanced supply security in Switzerland.
Dunkerque LNG is offering its 2021 available regasification capacity and invites interested companies to contact Dunkerque LNG Commercial team to find out more.
Fluxys LNG is contemplating the option of creating up to 6 mtpa (or ~10,5 GWh/h) of additional firm regasification capacity in Zeebrugge in the future.
INT is pleased to announce the introduction of a new Consecutive Month Incentive for July and August 2025
INT is pleased to announce the introduction of new a Multi Year, Summer Incentive, a Within Day Conversion Service & a reduction to its UK to BE Commodity Charge.
Fluxys TENP GmbH is tendering an estimated total quantity of 205,000 MWh natural gas (H-gas) and 21.715 MWh biomethane.
The delivery period runs from 1 January 2026, 06:00 hours to 1 July 2026, 06:00 hours.
Interested bidders can submit their bids by 11 December 2025 at 14:00 hours at the latest.
The prequalification phase for both tenders ends on 2 December 2025 at 14:00 hours.
Brussels, 8 October 2025 — The agricultural organisations Boerenbond, ABS (Algemeen Boerensyndicaat) and FWA (Fédération Wallonne de l'Agriculture) have concluded a new protocol with the owners and operators of underground transport pipelines, represented by Fetrapi. This protocol sets out clear agreements on compensation for damage to agricultural land and crops during works.
Participate in our market consultation that will take place from 17 October 2025 to 7 November 2025.