Incremental process 2019

1 July 2019

 

26 August 2019

 

21 October 2019

Yearly
Capacity Auctions

 

Submission of non-binding
demand indications*

Start of work on DAR 2019

 

Publication of DAR

- On Fluxys website
- On ENTSOG website

         

Step 1 – Non-binding demand indications

Parties interested in incremental capacity can submit non-binding demand indications at any time. However in the 2019 market demand assessment, Fluxys considered non-binding demand indications submitted no later than 26 August 2019 (cob). Non-binding demand indications received after this deadline will be considered in the next market demand assessment – in 2021.

Non-binding demand indications can be submitted using the non-binding demand indications templates:

Fluxys Belgium

Download this form and send it to info.transport@fluxys.com.

Fluxys TENP & Deutschland

Download this form and send it to the TSO association FNB Gas.

Interconnector UK

Download this form and send it to consultation@interconnector.com


Step 2 – Demand Assessment Reports (DAR)

Fluxys
Company
IPs/Market Areas TSOs Document
Fluxys Belgium ZTP-TTF Fluxys Belgium / GTS

DAR ZTP-TTF

Fluxys Belgium ZTPL-TTF Fluxys Belgium / GTS DAR ZPTL-TTF
Fluxys Belgium ZTP-PEG Fluxys Belgium / GRTgaz DAR ZTP-PEG
Fluxys Belgium ZTPL-PEG Fluxys Belgium / GRTgaz DAR ZTPL-PEG 
Fluxys Belgium ZTP-THE
Fluxys Belgium / Fluxys TENP, Gascade, OGE, Thyssengas
DAR ZTP-THE
Fluxys Belgium ZTP-IZT Fluxys Belgium / Interconnector
DAR ZTP-INT

Fluxys Deutschland

THE-RU Fluxys Deutschland, GASCADE, Gasunie Deutschland, NEL Gastransport, ONTRAS Gastransport, OPAL Gastransport DAR THE-RU
Fluxys Deutschland
THE-N4G Fluxys Deutschland, GASCADE, ONTRAS Gastransport, Gasunie Deutschland, GRTGaz Deutschland, OGE / NET4gas

DAR THE-N4G

Fluxys TENP THE-ZTP Fluxys TENP, GASCADE, OGE, Thyssengas / Fluxys Belgium
DAR THE-ZTP
Fluxys TENP THE-Switzerland Fluxys TENP, Terranets BW, Bayernets, OGE
DAR THE-Switzerland
Fluxys TENP THE-TTF Fluxys TENP, GASCADE, Gasunie Deutschland, Thyssengas, Gastransport Nord, OGE / GTS
DAR THE-TTF
Interconnector IZT-ZTP Interconnector / Fluxys Belgium DAR INT-ZTP
Interconnector IBT-NGG Interconnector / National Grid Gas DAR INT-NGG

You can also consult the Demand Assessment Reports on the ENTSOG website