Get your BioLNG Liquefaction capacity at Zeebrugge

Bring ships with BioLNG or convert a biomethane certificate into a BioLNG certificate into the terminal of Zeebrugge.

Nachrichten

Beschreibung

The Zeebrugge LNG Terminal is certified according to the ISCC framework, which allows the terminal to be part of a BioLNG supply chain and ISCC certified shippers to obtain a BioLNG certificate.

There are 2 ways to obtain BioLNG in the Zeebrugge Terminal:


1. Bring gas with a biomethane certificate to the terminal and convert it to LNG with a BioLNG certificate

This conversion is subject to the “mass balance principle” which means that:

    1. the biomethane which reaches the Zeebrugge Terminal via backhaul capacity in the
        Belgian Transmission grid,
    2. is liquefied and
    3. the BioLNG liquefaction capacity has been allocated to such shipper for the certificate
        transfer.

When the conversion into BioLNG is executed, you can:

    4. Store your BioLNG and
    5. Use your BioLNG for different applications

You can choose to take care of all steps in the BioLNG supply chain or only some.

 

 

Overview of costs for bio-LNG chain in January 2024

* Indexation:
Transmission = yearly indexation
Entry BE gas grid
Exit BE gas grid to ZBG Terminal (backhaul)

LNG = monthly indexation
Backhaul liquefaction
BioLNG liquefaction
Storage (day)
Truck slot

** 1 truck = approx. 40 m3 of LNG = approx. 268 MWh


2. Bring BioLNG with an ISCC BioLNG certificate to the terminal

Discover the services and their tariffs in order to:

    1. Unload your BioLNG in Zeebrugge
    2. Store your BioLNG and
    3. Use your BioLNG for different applications


You can choose to take care of all steps in the BioLNG supply chain or only some.

Good to know

At the LNG terminal of Zeebrugge, two (re-)liquefaction units, referred to as "recondensers", are used in the process flow for regasification.
 
In those recondensers the natural gas is cooled down and liquefied, this technical liquefaction process allows terminal users to convert biomethane certificates into BioLNG certificates. The GHG emission related to the bioLNG process for 2024 is 0,227 gCO2eq/kWh (as audited under ISCC EU rules).
 
As the demand for converting biomethane certificates into BioLNG certificates might exceed the capability of the recondensers, a transparent and non-discriminatory demand procedure and allotment rule are required.

 

Check availability and book

a) Long-term capacity:

Each year long-term capacity for an amount of 21.6 GWh/month is offered through a subscription window. After the closure of the current subscription window, the remaining capacity will be available on a  “First Committed, First Served” basis.

Long Term availability: Sold out in 2024 and 2025.

How to subscribe?

Subscribe to long-term capacity for a service period starting as from next 1st of the month until the end of the current year, any subscription needs to be done 5 business days prior to this month.

1. Follow the 5 steps process to become a Fluxys LNG shipper and sign a free LNG Terminalling Agreement (LTA)
2. Read the Terms and Conditions of Subscription Window (TCSW)
3. Fill in this form and return it to info.lng@fluxys.com.

How to use?

On the Gsmart platform or via this link, nominate your capacity by submitting your request. 

In case of IT issue, you can filling in this form, return it to info.lng@fluxys.com and you will be ready to use it.

 

b) Short-term capacity:

Each month during a short-term subscription window you can secure available Short Term BioLNG capacities at our Zeebrugge LNG terminal. The short-term capacity of the month (M) will depend on the short-term capacity sold during M-1 and long-term capacity used during M-1 and will be made available latest on M+3 days.


Request Period Max Allocation Date
January 1 - 4/1/2024 8/1/2024
February 1 - 5/2/2024 7/2/2024
March 1 - 5/3/2024 7/3/2024
April 1 - 4/4/2024 8/4/2024
May 1 - 6/5/2024 8/5/2024
June 1 - 5/6/2024 7/6/2024
July 1 - 3/7/2024 5/7/2024
August 1 - 5/8/2024 7/8/2024
September 1 - 4/9/2024 6/9/2024
October 1 - 3/10/2024 7/10/2024
November 1 - 6/11/2024 8/11/2024
December 1 - 4/12/2024 6/12/2024

 

Any request received after this subscription window will be allocated on “First Committed, First Served” basis.

Short Term availability: 938.993.67 MWh (last update 07/11/2024)

 

How to subscribe?

To participate in the short-term subscription window, or outside of it for the allocation on a “First Committed, First Served” basis:

1. Follow the 5 steps process to become a Fluxys LNG shipper and sign a free LNG Terminalling Agreement (LTA)
2. Read the Terms and Conditions of Subscription Window (TCSW)
3. Submit your request on the Gsmart platform or via this link, every beginning of the month during the related request period. When allocated, the quantities can immediately be used.

In case of IT issue, fill in the Service Demand Form (SDF for 2024)  and return it to info.lng@fluxys.com

Auch interessant

LNG TerminallingScheduling Services

Backhaul Liquefaction in Zeebrugge

LNG TerminallingScheduling Services

Reload your LNG ship in Zeebrugge

LNG stored in tanks at Zeebrugge can be loaded by small or large-scale LNG ships.
LNG TerminallingScheduling Services

Load your LNG in trucks or containers in Zeebrugge

Load your LNG truck or container at the Zeebrugge terminal at any time.