Hydrogen pipeline in North Sea Port
|
To better respond to the current market situation, the project timeline has been adjusted. The execution of studies and fieldwork is postponed to a later, more suitable time. |
Key figures
- The pipeline will be built in the following municipalities: Gent, Evergem, Zelzate, Lochristi
- Length: 33.7 km
- Diameter: 600 mm
Documents
You can download the presentations (in Dutch) from the various information sessions here:
Infosessions
You can download the presentations as part of the application for an environmental permit:
- Bei Fragen oder für weitere Informationen wenden Sie sich bitte an Fluxys!