Fluxys LNG has 1 remaining unloading slot on sale on 26 May 2024 after the auction of 13 March 2024 at 10h.
The slot will be allocated on a first committed first served basis.
Bids can be submitted for natural gas (H-gas) as well as for biogas.
The delivery period runs from 1 January 2024, 06:00 hours to 1 July 2024, 06:00 hours.
Fluxys TENP GmbH is tendering an estimated total quantity of H-gas of 207,000 MWh and biogas of 17,468 MWh.
Interested bidders can submit their bids by 27 November 2023 at 14:00 hours at the latest.
Annual Interruptible Capacity made available via IAM for use within INT's Ten Year+ Annual Capacity Structures.
Aujourd'hui, le 6 décembre 2023, dans le cadre de la visite d'État de Leurs Majestés le Roi et la Reine des Belges en Allemagne, les CEO de Fluxys Belgium et d'OGE ont signé une version actualisée d'un accord de coopération pour le transport d'hydrogène.
Since firm capacity for April is sold out on the VIP THE-ZTP, Fluxys Belgium intends to offer interruptible capacity in the upcoming Monthly auction on 27 March 2023.
From 16 June to 07 July 2023, Fluxys Belgium is holding a market consultation to propose adjustments to its regulatory documents for transmission with a focus on changes to the Access Code for Transmission Attachment B.
From 23 March to 14 April 2023, Fluxys Belgium is holding a market consultation regarding the regulatory documents applicable for transmission with a focus on the merger of the ZTP Physical and ZTP Notional Trading Services and the stop of the Imbalance Transfer Service and Imbalance Pooling Service.
Bids can be submitted for natural gas (H-gas) as well as for biogas.
The delivery period runs from 1 January 2023, 06:00 hours to 1 July 2023, 06:00 hours.
Fluxys TENP GmbH is tendering an estimated total quantity of fuel gas of 210,000 MWh.
Interested bidders can submit their bids by 11 October 2022 at 14:00 hours at the latest.
Interconnector has coordinated with its adjacent grid operators and is proposing a planned maintenance shutdown period in the month of September 2024.
Interconnector’s Pipeline Inspection Procedure is planned to commence on 1 October 2023
Interconnector has today published the latest version of its Charging Statement effective from 01st October 2023.
Interconnector has today published the latest version of its Charging Statement to include Summer-23 BE to UK capacity offered via IAM
Following a significant growth in the truck loading activities at the Zeebrugge terminal, Fluxys LNG has already taken several actions to maximize the truck loading offer and its utilisation. Fluxys LNG has for example implemented scheduling congestion rules in the regulatory documents and is investing in four new self-loading bays.
Fluxys LNG is offering Slots to unload, store and regasify a LNG cargo in the Zeebrugge LNG Terminal, starting on 25 and 30 March 2024.
Fluxys Belgium and Interconnector propose to simplify the Belgium H-market, as well as the trading arrangements between the NBP and ZTP.
Based on the mixed feedback received during the consultation on the proposals aimed at simplifying the Zeebrugge Area and the arrangements relating to the Interconnection Point with Interconnector, have Fluxys Belgium and Interconnector concluded that the current timing for revising its market model is not right, and have therefore decided to put this initiative on hold. This means that both the ZTP Physical and Notional trading services will remain, as will the Zeeplatform and the interconnection points at Zeebrugge and IZT.
We hope to meet you at E-world in Essen from 21 to 23 June 2022.
Seize this unique opportunity to meet our representatives from Germany, the UK, Belgium, Switzerland, France or our developers from the Hanseatic Energy Hub and Hydrogen and Carbon projects.
From 17 November to 08 December 2023, Fluxys Belgium is holding a market consultation to propose adjustments to its regulatory documents for transmission with a focus on changes to the Access Code for Transmission, the Standard Transmission Agreement and the Transmission Programme.
INT is today launching a stakeholder consultation on proposed changes to its Access Rules and Charging Methodology
FluxSwiss has published the schedule of the maintenance activities planned for the calendar year 2024 related to forward and reverse flow capacities.