Following the recent regulatory approvals, IUK is excited to announce that we will now be offering Implicit Allocation through two new Implicit Allocation Partners, Griffin Markets Limited and Cavendish Markets B.V., alongside our existing Partner, HPC SA.
Following the necessary regulatory approvals, you can now book up to 75% instead of 50% of our firm capacity through Implicit Allocation Mechanism (IAM).
IUK welcomes the recent decision of its regulators to approve its revised Access Terms, including the increase to the amount of capacity that can be offered via IUK's Implicit Allocation Mechanism.
IUK is pleased to announce the publication of its tariffs for Gas Year 2019–20, ahead of the PRISMA annual capacity auction in July.
In compliance with the Network Code on Capacity Allocation Mechanisms in Gas Transmission Systems, Commission Regulation (EU) 2017/459, IUK and our adjacent TSOs, National Grid Gas and Fluxys Belgium, are now accepting non-binding demand indications for a period of eight weeks until the 26 August 2019.
IUK is today launching a consultation seeking your views on proposed changes to the IUK Access Terms and the IUK Charging Methodology. For more information on this consultation, please see our Latest Consultations page.
Today Fluxys Deutschland has published the reference price calculated together with the other TSOs of the market area GASPOOL as required by BNetzA decision REGENT (BK9-18/611-GP).
The Reverse Flow project is progressing as planned. South-to-north reverse flow capacity in the TENP system will be available to the market as from 1 October 2018.
Do you require Belgian Domestic Exit capacities for 2020 ? You can now simulate prices through the Price Simulator for :
• Public Distribution (Exit Points connected with the DSO network)
• End Users directly connected to the Fluxys Grid
Consultation regarding the request for a single exemption from the obligation to enable bi-directional capacity at the interconnection point Deutschneudorf-EUGAL
Durant le premier semestre de 2019, le nombre de navires venus amarrer au Terminal GNL de Zeebrugge a augmenté de 123 % comparé à la même période en 2018. Fluxys Belgium constate également une augmentation remarquable au niveau du nombre de camions-citernes de GNL chargés.
Extensive inspections on TENP I (Trans Europa Naturgas Pipeline), one of the two natural gas transmission pipelines of the dual gas transmission system from Bocholtz (on the German/Dutch border) to Wallbach (on the German/Swiss border), have revealed corrosion defects, as published by Open Grid Europe GmbH (OGE) and Fluxys TENP GmbH (Fluxys TENP), the transmission system operators of the TENP (Trans Europa Naturgas Pipeline) pipeline System, on 27th September 2017.
The delivery period runs from 1 January 2020, 06:00 hours, for an indefinite period.
The heating gas should be delivered at the point Achim II in the market area GASPOOL.
Interested bidders are requested to submit their bids by 3 December 2019 at 14:00 hours at the latest.
Fluxys Belgium and our adjacent TSOs, have jointly completed the assessment of market demand for incremental capacity.
The concerned German Transmission System Operators have published a market information regarding the delay of the VIP-implementation.
Participate in our market consultation as from 23 October until 12 November 2019 on the changes in the regulatory documents.
The delivery period runs from 1 January 2019, 06:00 hours to 1 July 2019, 06:00 hours. Fluxys TENP GmbH is offering 8 lots at the delivery point NCG VTP. Interested bidders are kindly requested to submit their bids by 12 December 2018 at 14:00 hours at the latest.
In accordance with Article 4 (2) of the Commission Regulation (EU) 2015/703 of 30 April 2015 establishing Network Code on Interoperability and Data Exchange Rules (“NC INT”), GASCADE invites network users to comment on the proposed text of certain excerpts from the following documents.
A major milestone has been achieved. Balansys becomes Balancing operator for the Belux area. Participate in our market consultation as from 12 November until 11 December 2019 on the changes in the regulatory documents.
During the yearly auction of 1 July 2019, Fluxys TENP GmbH will not offer any firm or conditionally firm freely allocable entry capacities as from 1 October 2021.