2019 : A record year for the operations at Zeebrugge LNG Terminal

2019 was very intense at the Zeebrugge LNG Terminal. Thanks to a lot of operations, the results were much higher than the previous year :

  • 2620 LNG Truck were loaded (compared to 1453 in 2018)
  • 91 cargoes were unloaded (compared to 33 in 2018)
  • 40 cargoes were reloaded (compared to 25 in 2018)

20 out of the 40 were small scale reloads.

19 out of the 40 reloads were part of a transshipment operation. For 2020 we expect even more transshipment operations because the 5th storage tank of a 180 000 m³ LNG is fully operational since December 2019.

Since January 2019, a second truck loading station operates in parallel with the first one, allowing day-ahead flexibility and high availability for the Truckloading services (8000 slots per year).


X

Ce site utilise des cookies

Un cookie est un petit fichier envoyé par le serveur de ce site sur le disque dur de votre ordinateur lorsque vous consultez le site. Le code repris dans le cookie permet de reconnaître l’ordinateur lors d'une visite ultérieure.

Le cookie est utilisé pour enregistrer votre localité et votre choix linguistique afin que lors d'une visite ultérieure, vous voyiez directement apparaître le site dans la langue de votre choix.

Politique Relative aux Cookies
OK