2019 : A record year for the operations at Zeebrugge LNG Terminal

2019 was very intense at the Zeebrugge LNG Terminal. Thanks to a lot of operations, the results were much higher than the previous year :

  • 2620 LNG Truck were loaded (compared to 1453 in 2018)
  • 91 cargoes were unloaded (compared to 33 in 2018)
  • 40 cargoes were reloaded (compared to 25 in 2018)

20 out of the 40 were small scale reloads.

19 out of the 40 reloads were part of a transshipment operation. For 2020 we expect even more transshipment operations because the 5th storage tank of a 180 000 m³ LNG is fully operational since December 2019.

Since January 2019, a second truck loading station operates in parallel with the first one, allowing day-ahead flexibility and high availability for the Truckloading services (8000 slots per year).


X

This site uses cookies

A cookie is a small file sent by the site server to your computer’s hard drive when you browse the website. The code contained in the cookie allows your computer to be recognised when you next visit the site.

The cookie is used to record your location and choice of language so that on subsequent visits the website appears automatically in your chosen language.

Cookie Policy
Confirm